Case Studies
An example of a project where the customer had a small IT
department.
|
Company Profile |
Engineering Manufacturer |
|
Location |
|
|
Project Outline |
Creation of CRM, Enquiry Management, SO,
This scale of this project dramatically changed the operational effectiveness of the customer. The project initially required many weeks of specification and process mapping to fully understand the current operation of the customer before the process could be mapped to the new system. The project needed to integrate with an existing and live ERP system. The data was required to be extracted and imported to the new system without causing a hitch in live production. Quality Assurance servers were used to plan and test the rollout before going live. The project was handed over with a 12-month support package agreed for maintenance and user support. |
|
No of Users |
15 - 20 |
|
Technologies | |
|
Front End |
VB & Crystal |
|
Middle Tier |
VB - DLL and COM |
|
Back End |
SQL Server |
|
Other information |
Integration into Sage, Database, extensive use of DTS, Automatic Email, utilisation of bar code equipment |
|
Non IT Support |
Purchase order and Sales order processing. |
An example of a large scale project where the customer required modification to an existing product.
|
Company Profile |
Vehicle Manufacturer |
|
Location |
|
|
Project Outline |
Quality Management Database. A customer needed to improve its quality control while tackling supplier quality issues. A current product in the marketplace, which met 60% of the project needs, was chosen as the backbone. The remainder of the requirements were built to achieve the project goals. A customer-facing tool was built to collect customer feedback via the web along with a statistical package to report upon supplier performance when considered against like product groupings. The project used full-scale development, quality assurance and production environments before being rolled out globally. |
|
No of Users |
500+ |
|
Technologies | |
|
Front End |
VB, Crystal (Citrix), Web IIS |
|
Middle Tier |
VB - DLL and COM |
|
Back End |
Oracle |
|
Other information |
Automatic Email, XML, Integration with legacy systems, utilisation of bar code equipment |
|
Non IT Support |
Supplier management and continuous quality system improvement. |
An example of the development of a brand new product.
|
Company Profile |
Inter Government and Education Agencies |
|
Location |
|
|
Project Outline |
Information push to PDA's through the web and server installation. In order to support a tourist initiative in the
The PDAs were able to detect which hotspot they were in and request information via an internet server to display relevant information to the user regarding the areas of interest in their immediate vicinity. The project succeeded in its aims and was very well received by
the tourist authority with a national press release. The scheme is now
scheduled to be rolled out in the
|
|
No of Users |
60+ |
|
Technologies |
|
|
Front End |
PocketPC 2003, Embedded C++, Web (IIS) |
|
Middle Tier |
NDIS Drivers |
|
Back End |
SQL Server |
|
Other information |
|
An example of a Rapid Application Development (RAD) project.
|
Company Profile |
Transportation Company |
|
Location |
|
|
Project Outline |
Front end to control and query Baan Export file. An existing Baan database was in use by a large transportation company. The user interface and batch process did not express the availability of stock against the sales order items. A RAD methodology was used for the project in order to prove the value of the reports generated. The project provided the information over the twelve months required to prove the proof of concept. The reports were later rolled out to the whole company using a full scale production server. |
|
No of Users |
10 |
|
Technologies | |
|
Front End |
VB, Crystal |
|
Middle Tier |
|
|
Back End |
Access |
|
Other information |
Data Pull from Baan into Access for
|
|
Non IT Support |
Project Management |
An example of application development in conjunction with an existing IT department where the IT department is in another country.
|
Company Profile |
Tier 1 Automotive Supplier |
|
Location |
|
|
Project Outline |
Production Monitoring Software – Automatic monitoring of various key parameters (Quantity Good, First pass rate, Yield, Changeover times, Machine utilisation). A site with 14 manufacturing lines required real-time
information to inform the management team as to the location of problem
areas. The lines could only output their information as text delimited
flat files. The output was provided by the IT department, which was based
in A routine was developed to regularly poll the text files of each line and extract the data. This data was loaded into a SQL database. The new data was processed every 60 seconds to update a control screen. Shift reports were calculated at the end of each shift. The management team used the system to substantially improve internal workflows and procedures. |
|
No of Users |
4 |
|
Technologies | |
|
Front End |
VB |
|
Middle Tier |
VB – DLL |
|
Back End |
SQL |
|
Other information |
Data import form all production lines using polling routine |
|
Non IT Support |
None |